Description and Specification for Lab Tenders
Spray Tower.
"The setup is designed to demonstrate principles of spray extraction and
mass transfer operation in a column.
The set up consists of a glass column, feed tanks, air regulator with
pressure gauge, receiving trays and piping. Rotameter are provided for
flow measurement
Experiments
Determination of overall height of a transfer unit and overall
volumetric mass transfer coefficient
Features
Stainless Steel tanks and wetted parts
Special arrangement for changing height of interface zone
Continuous operation
Superb Painted structure
Simple to operate & maintain
Compact & stand alone set up
Utilities Required
Electric supply Provide 230 +/- 10 VAC, 50 Hz, single phase electric
supply with proper earthing. 5A, three pin socket with switch for
Compressor
Chemicals for trial as per your choice
Compressed Air supply: Clean, oil and moisture free air, pressure 2 Bar.
Water Supply & Drain as required"